Can an OSR15-MCW or any other LumaCAN sensor, in conjunction with an analog sensor connected to an AI input? Be assigned to control the same load?
If yes, what is the order of operations?
Does one take priority?
Or
Does the first activated sensor turn the load ON, and the last sensor to time...
Are the breakers in the TLLP rated at 100% load or do they need to be derated?
For example, if my track load is 10 amps.
Do I need to specify a 10Amp breaker in the panel or a higher to include derating?
If derating is required. What is the percentage?
There are TWO configuration utilities, one for the series 7000/7100 and one for the series 7200/7300
The CT pictures and data are stored in a file named "Local" The folder must be located in the local drive root directory.
The one for the series 7000/7100 is called "Power Meter Viewer."...
User-level Pin is assigned on a page basis. this allows the administrator to grant access to pages with different levels of control. If desired the same Pin can be used for every page.
From the home page enter the Page Settings Mode.
On the bottom center of the screen, press on the Date and...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.